📄 Document Information
Product Models: YD-YP600ES1 / YD-CS600
System Name: ITAD HDD 2–3mm Shredding and Recycling Line
Document Type: System Layout / Process Flow Drawing
Equipment Type: Hard Drive Destruction Line / IT Asset Recycling Equipment / Two-Stage HDD Shredding System / Magnetic Separation and Dust-Collection System
File Name: yuedu-itad-hdd-2-3mm-shredding-and-recycling-line-layout.pdf
Brand: Shanghai YUEDU Technology Co., Ltd.
————————————————————
📥 Download Information:
Click the button below to download the complete YUEDU ITAD HDD 2–3mm Shredding and Recycling Line layout.
The document illustrates the complete process from primary twin-shaft shredding and ferrous-metal separation to hammer-mill fine shredding, cyclone separation and pulse-jet dust collection.
It also provides the main equipment models, motor powers, conveyor reference length, approximate production-line dimensions and dust-collection arrangement for preliminary equipment selection, process evaluation and facility-layout planning.
The solution is intended for ITAD companies, data centers, secure destruction providers, e-waste recyclers and government data-media destruction projects.
yuedu-itad-hdd-2-3mm-shredding-and-recycling-line-layout.pdf
————————————————————
📌 1. System Overview
The YUEDU ITAD HDD Shredding and Recycling Line is a two-stage processing system designed for the physical destruction of mechanical hard drives, data-security applications and recovery of valuable materials.
Complete hard drives first enter the YD-YP600ES1 twin-shaft shredder for low-speed primary shredding. This stage breaks and separates the drive enclosure, platters, magnets, spindle components and electronic parts.
The primary-shredded material is transferred by a magnetic-separation conveyor. Ferrous components suitable for magnetic recovery are removed before the remaining material enters the YD-CS600 hammer mill for secondary fine shredding.
The target final particle range is approximately 2–3mm. The fine-shredding system is connected to a cyclone and pulse-jet dust collector to capture dust, improve the working environment and support project-specific explosion-protection measures.
The line combines data destruction, material separation, dust control and downstream recycling in one integrated process.
————————————————————
📌 2. Process Flow
Complete HDDs
→ Twin-shaft primary shredding
→ Magnetic separation and ferrous-metal removal
→ Hammer-mill fine shredding
→ Target 2–3mm particles
→ Cyclone separation and pulse dust collection
→ Material collection and downstream recycling
Detailed process:
Complete mechanical hard drives are loaded into the primary twin-shaft shredder
The cutting shafts shear, compress and tear the drive enclosure and internal components
Primary-shredded material is discharged onto the magnetic-separation conveyor
Ferrous metals and magnetic components are separated during conveying
The remaining material enters the hammer mill for secondary fine shredding
An approximately 3mm screen controls the target output size
Dust is collected through the cyclone and pulse-jet filtration system
Processed materials are collected for separation, recovery or downstream treatment
————————————————————
📌 3. Key Features
✔ Designed for the ITAD and data-media destruction industries
✔ Complete mechanical hard drives can enter the primary shredder
✔ Two-stage shredding with twin-shaft primary reduction and hammer-mill fine processing
✔ Target final particle range of approximately 2–3mm
✔ 11kW primary twin-shaft shredder
✔ 22kW secondary hammer mill
✔ Magnetic separation after primary shredding
✔ Supports recovery of ferrous materials from shredded drives
✔ Cyclone and pulse-jet dust-collection combination
✔ Flexible duct connection between the hammer mill and dust collector
✔ Dust-collection module can be positioned according to site conditions
✔ Conveyor length can be adjusted to suit the available facility space
✔ Modular structure for transportation, installation and maintenance
✔ Stable and reliable configuration for controlled hard-drive destruction
✔ Explosion-protection and safety systems available according to project requirements
————————————————————
📌 4. Main Equipment and Layout Information
System Item
Reference Information
Primary Shredder
YD-YP600ES1 twin-shaft shredder
Primary Shredder Power
11kW
Primary Process
Low-speed twin-shaft shredding
Primary Shredder Reference Width
600mm
Primary Machine Reference Height
Approx. 1630mm
Transfer Equipment
400 Series magnetic-separation conveyor
Conveyor Reference Length
4500mm
Intermediate Process
Conveying and ferrous-metal separation
Secondary Shredder
YD-CS600 hammer mill
Secondary Shredder Power
22kW
Secondary Machine Reference Length
2000mm
Target Screen
Approx. 3mm
Target Final Particle Size
Approx. 2–3mm
Dust Treatment
Cyclone and pulse-jet dust collector
Dust-Collector Reference Height
Approx. 2000mm
Dust Connection
Flexible ducting
Main-Line Reference Length
Approx. 8050mm
Conveyor Length
Adjustable according to site space
Layout
Modular linear arrangement
Notes:
The approximately 8050mm dimension is the main-line reference length shown on the drawing. It excludes transfer gaps, service access and required safety clearances.
The 4500mm conveyor length is a reference value. The conveyor can be shortened or adjusted, with a corresponding change in the overall line length.
Machine elevations, conveyor angle, duct routing and module positions shown in the document are conceptual references.
Final footprint, installation height, transfer chutes, maintenance access and safety distances must be confirmed according to the actual site and approved engineering drawings.
The 2–3mm output is a target range. Actual particle distribution depends on hard-drive construction, screen size, hammer configuration, wear condition and feeding parameters.
————————————————————
📌 5. Two-Stage Shredding Design
The system uses primary shredding followed by secondary fine shredding.
The first stage uses the YD-YP600ES1 twin-shaft shredder. Its low-speed, high-torque cutting action opens and breaks complete hard drives into material suitable for magnetic separation and secondary processing.
The second stage uses the YD-CS600 hammer mill. The hammer system subjects the pre-shredded and magnetically separated material to further impact, shearing and size reduction. A screen controls the target final particle size.
Compared with primary shredding alone, the two-stage process further reduces fragment size, increases the difficulty of recovering data from the destroyed media and creates material more suitable for downstream separation and recycling.
————————————————————
📌 6. Magnetic Separation and Material Recovery
Hard drives contain ferrous metals, aluminum, platters, printed circuit boards, magnets and other components.
A magnetic-separation conveyor installed after the primary shredder removes part of the ferrous-metal fraction and larger magnetic components before the remaining material enters the hammer mill.
This stage can:
✔ Recover ferrous materials
✔ Reduce the amount of large magnetic components entering the fine shredder
✔ Reduce some impact loads on the secondary shredding system
✔ Improve conditions for downstream material separation
✔ Increase the resource-recovery value of ITAD projects
Actual separation efficiency depends on drive construction, primary-shredding result, material-bed depth, magnetic strength and conveyor speed. The final magnetic configuration should be confirmed by representative material testing.
————————————————————
📌 7. Dust Collection and Explosion-Protection Considerations
Hammer-mill processing can generate metal dust, printed-circuit-board dust and other fine particles. The system therefore incorporates a cyclone separator and pulse-jet dust collector.
The cyclone removes larger airborne particles before the pulse collector filters finer dust, helping improve the working environment and reduce uncontrolled dust emissions.
Flexible ducting connects the dust module to the hammer mill, allowing the collector to be positioned near the main machine according to site conditions.
Where combustible dust or a specific explosion-protection requirement applies, the following items should be evaluated according to the material, local regulations and facility safety standards:
✔ Explosion-protected motors and electrical components
✔ Explosion venting, isolation or suppression
✔ Antistatic ducting and grounding
✔ Spark detection and extinguishing
✔ Temperature and load monitoring
✔ Dust-collector location and safety distance
The conceptual dust-collection layout does not constitute a certified explosion-protection design. The required protection level and safety configuration must be confirmed during project engineering.
————————————————————
📌 8. Data Destruction and Compliance Applications
Reducing hard drives to approximately 2–3mm particles can support high-security physical-destruction objectives for ITAD companies, government organizations, data centers and secure destruction service providers.
The system can:
✔ Physically destroy complete hard drives
✔ Damage the drive enclosure, platters and internal structure
✔ Reduce primary-shredded material to approximately 2–3mm particles
✔ Increase the difficulty of recovering data from destroyed media
✔ Integrate with drive registration, weighing, video recording and destruction-certificate workflows
✔ Support a traceable hard-drive receiving, destruction and recycling process
Requirements for particle size, records, operator authorization and certificates of destruction vary by country, industry, customer and government project.
Final compliance must be evaluated against the applicable regulation, tender specification, customer security policy or required destruction standard. Machine configuration, screen size and acceptance method should be confirmed before ordering.
————————————————————
📌 9. Applicable Industries
ITAD Companies / IT Asset Recycling Companies / Data Centers / Cloud-Service Providers / Government Departments / Military and Classified Organizations / Banks and Financial Institutions / Telecommunications Companies / Large Enterprises / E-Waste Recyclers / Secure Destruction Centers / Third-Party Data-Destruction Providers
————————————————————
📌 10. Applicable Materials
✔ 3.5-inch mechanical hard drives
✔ 2.5-inch mechanical hard drives
✔ Desktop computer hard drives
✔ Laptop hard drives
✔ Enterprise hard drives
✔ Server mechanical hard drives
✔ Other magnetic hard drives suitable for the system
Solid-state drives, heavy enterprise drives, media with large heat sinks and other electronic products differ substantially in construction and composition.
Where SSDs, mobile phones, tablets, printed circuit boards or other media must also be processed, representative samples should be provided and the cutters, screens, magnetic separation, dust collection and explosion-protection configuration should be reviewed separately.
————————————————————
📌 11. Information Required for System Selection
Before confirming the system configuration, customers should provide:
Types of hard drives to be processed
Maximum drive dimensions and unit weight
Required hourly or daily processing quantity
Required final particle size
Applicable industry or government destruction standard
Whether SSDs or other electronic media must also be processed
Required recovery of steel, aluminum and PCB materials
Site voltage and frequency
Available facility length, width and height
Feeding and finished-material collection methods
Local dust and explosion-protection requirements
Requirements for weighing, video recording, barcode scanning or destruction certificates
————————————————————
📌 12. Document Includes
✔ HDD destruction line top-view layout
✔ HDD destruction line side-view layout
✔ Complete HDD loading position
✔ YD-YP600ES1 twin-shaft shredder arrangement
✔ 11kW primary-shredding power information
✔ 400 Series magnetic-separation conveyor
✔ 4500mm conveyor reference length
✔ Magnetic ferrous-removal process
✔ YD-CS600 hammer-mill arrangement
✔ 22kW secondary fine-shredding power information
✔ Approximately 3mm screen target
✔ Cyclone and pulse dust-collection arrangement
✔ Flexible dust-duct connection
✔ Approximately 8050mm main-line reference length
✔ Customizable conveyor-length information
✔ Installation-space and maintenance-clearance notes
————————————————————
📌 13. Why Choose YUEDU
✔ Specialized in data-media destruction and industrial shredding equipment
✔ Complete HDD primary shredding, magnetic separation and fine-shredding process
✔ 2–3mm target particles for high-security destruction projects
✔ Combined data-security and material-recovery value
✔ Modular design for transportation, installation and maintenance
✔ Conveyor and system layout customized to available facility space
✔ Cyclone and pulse-jet dust-collection solutions
✔ Explosion-protection and safety-system engineering support
✔ Customer hard-drive sample testing
✔ System design, manufacturing, testing, commissioning and delivery support
————————————————————
📞 Contact Us
Shanghai YUEDU Technology Co., Ltd.
☎️ Phone: +86 159 0178 2779 (WhatsApp / WeChat / Facebook / Telegram)
Website: www.yuedushredders.com
————————————————————
上一篇:【文档下载】ITAD硬盘2–3mm粉碎及回收生产线布局图(越都)
下一篇:没有了!